HalfbackH20 with Moisture Management Adds R-3.8 Behind Brick & Fiber Cement on University Residence Hall Complex
1871 Old Main Drive, Shippensburg, PA 17257
Located less than an hour outside of Harrisburg, Shippensburg University is a bachelor and masters degree granting institute with a rich history in teaching excellence.
The three-building residence hall complex is four to five stories high, will accommodate 924 university students and will cost an estimated $70 million when complete. The 306,436 square foot complex is just phase one of a three-part project. All three phases are set for completion in the summer of 2015 and will cost a total of $200 million.
The complex was designed by CUBE 3 Studio, LLC. www.cube3studio.com
The general contractor was Fortune Johnson. www.fortune-johnson.com
The consulting engineer was Greenman-Pederson, Inc. www.gpinet.com
Campus Apartments is overseeing the project. www.campusapts.com
HalfbackH20 Universal Siding Insulation was specified by CUBE 3 Studio, LLC to be installed underneath the exterior brick and fiber cement panel siding. HalfbackH20 provided R-3.8 insulation on the exterior as well as maximum moisture management with drainage grooves built into the foam and a permeability rating of 3.5. The project is estimated to require over 1,500 squares of HalfbackH20 before completion.
The University and CUBE 3 Studio, LLC were working hard to design these buildings to achieve Certified status under?the US Green Building Council’s LEED New Construction program.
In order to achieve this LEED Certified status on?this project, it was important that insulation be installed on the exterior of the building, and that the insulation be purchased from a manufacturer who was located no more than 500 miles from the construction site (saving on fuel used).
“Progressive Foam was able to work with us to provide a product that was versatile in meeting the performance goals and construction techniques of the project. They were able to deliver a cost-effective solution that was a great fit for the project.”
Project Manager John Harding, AIA LEED AP of CUBE 3 Studio,?LLC.
NYSERDA sponsored study shows Insulated Vinyl Siding outperforms fiber cement.
IVS was selected for this concept home, which meets requirements foe sustainability across the board.
The addition of exterior insulation was vital to reaching the energy efficiency goals of this…
A residential remodeling contractor chose HalfbackH20 to manage moisture in a sever mold remediation remodel.
HalfbackH20 was integrated to manage moisture on this multi-level commercial project.
A Newport Ventures study shows that installing new insulated vinyl siding with a WRB reduces…